Area Manager Duties to Optimize IT Consistency in New Five Guys Build
Timeline
Manager Desk Install
Internet Install
Manager PC plugged into the Bell/Telus router & email Thomas
Open the SonicWall and place on the middle shelf, as shown below
POS install
Manager Desk
Please note the location of each device
The printer and computer monitor will not be provided and must be purchased, usually by Guy Richardson from Staples.
The music system can go on the top or middle shelf, depending on how deep the shelves are and the length of each shelf. Ideally the top shelf is where it should go.
The printer and computer monitor can be moved around depending on the needs of the GM.
The POS tablet is shown below on the left, bottom shelf.
Power for all devices is on the top shelf, using one or two large surge protectors. These may need to be purchased if there are none on hand.
Please ensure all devices are labeled using a label maker.
Once the Internet is online and the manager PC is powered on, please connect the Manager PC directly to the Bell Router and call or email Thomas Holt: 1-801-828-7423 / thomas.holt@cypressfivestar.com
Once the security system is plugged into the accessory switch, please contact Thomas Holt.
Click to see Full Screen
Bell Router
Click to see Full Screen
Shipped to Each New Build
Below is a list of everything that will be shipped to the restaurant for the IT install
Please use the Velcro ties wherever possible to keep cabling neat and secure
There will be a printer cable shipped that is used to plug your new back office printer into the manager PC
There will be an HDMI cable shipped that is used to plug your new monitor into the manager PC
The green electrical tape should be used to mark the black pin pad cables as shown in the “Connections” section below.
The different coloured cables are using to connect the network.
Connections
Each connection needs to be labeled on both ends, usually done by the electricians
The colouring of each cord is important for each device, our POS provider should be ensuring this is correct.
The black pin pad cables under the POS must be marked with green electrical tape (provided).
Manager Desk Patch Panel
Click for Full Screen
Under the Front Counter POS
Click for Full Screen